test

Saturday, March 30, 2013

spare room before & after pics

Before we started, this room was l-shaped, with an en-suite bathroom in one corner. The floor was very unstable and dipped badly in the middle of the room.
Gutting the lath and plaster
Bags of blown-in insulation and debris
Gutting completed, brand new joists/floor installed
Insulation in and drywall up
Paint and carpet done
Finished result

We kept the en-suite bathroom, and widened the doorway to this room. If we ever add on to the house, it will be through the far wall of this room.

No comments:

Post a Comment